Technical data of the prototype
- Built
- 1937–1941
- Withdrawn
- 1986
- Wheel arrangement
- 1'D1'-h2
- Class
- G 46.18 / G 46.20
- Gauge
- 1435 mm (standard gauge)
- Length over buffers
- 23,905 mm
- Empty weight
- 92.6 t
- Maximum speed
- 90 km/h
- Power
- 1397 kW
The prototype
Looking for a new, fast goods locomotive, the DR took delivery of the prototype locomotive 41 001 in January 1937. Series production ran from October 1938. The St 47 K boiler, however, soon showed serious problems with cracking. Between 1957 and 1961 some locomotives received a new-build boiler in St 34. The locomotives were coupled to a type 2'2'T34 tender. The last locomotive of the class went to the DR in June 1941, making 366 units in almost four years. The build report on the 2'2'T34 tender shows how the tender bogies were made; you can also request the tender plan set separately there.
The Knorr cross-compound air pump with P-type valve gear
The cross-compound air pump hangs from the locomotive frame on the driver’s side. Cross-compound means that the steam and air ends both work in compound. The driving steam acts in a high-pressure and a low-pressure steam cylinder, and a high-pressure and a low-pressure air cylinder compress the air.
The P-type valve gear uses tapped steam at one end of the stroke and a tappet rod at the other to operate an auxiliary valve, which then moves the main valve by steam pressure.
The 1:11 replica is based on this type of pump but is not a true compound pump: both pistons receive live steam and control each other through drag valves. A piston is not reversed until the opposite one has reached the end of its stroke. As a result, the pistons strike the covers and stay there until everything has reversed. This benefits the air pump because the dead space is kept as small as possible, but the striking shortens the life of all the components. An O-ring between piston and cover cushions the impact and reduces the noise.
The most difficult part of the pump is the steam cylinder housing. To produce its curves on a conventional milling machine, I built a fixture that let me clamp the workpiece on the dividing head. Numerous holes then follow for the integral valve gear and the steam supply to the cylinders.
The air cylinder housings are split, because otherwise I could not have made them on a conventional milling machine. Once all the parts had been made and fitted to each other, I bolted them up as an assembly and milled them flat in one pass.
Plan views
The website shows only a small part of the plan set. With the complete set you can build the model without difficulty – every part is drawn and fully dimensioned.
Contents: Plan set BR 41 with T34 tender
- BR41-01-01 A00 General arrangement
- BR41-01-02 A1 Front and rear views
- BR41-01-03 A0 Leading truck
- BR41-01-04 A0 Rear carrying axle
- BR41-01-05 A00 Bar frame
- BR41-01-06 A0 Bar frame, boiler expansion plate
- BR41-01-07 A0 Bar frame, smokebox saddle
- BR41-01-08 A0 Bar frame, buffer beam
- BR41-01-09 A0 Cylinders
- BR41-01-10 A0 Cylinder parts
- BR41-01-11 A0 Brake
- BR41-01-12 A0 Smokebox
- BR41-01-13 A0 Boiler
- BR41-01-14 A0 Boiler parts
- BR41-01-15 A0 Cladding
- BR41-01-16 A0 Regulator
- BR41-01-17 A0 Cab
- BR41-01-18 A1 Steam feed pump
- BR41-01-19 A2 Axle-driven water pump
- BR41-01-20 A1 Cross-compound air pump
- Tender T34 BR41-02-01 A0 Assembly
- Tender T34 BR41-02-02 A1 Bogie 01
- Tender T34 BR41-02-03 A0 Bogie 02
- Tender T34 BR41-02-04 A0 Underframe
- Tender T34 BR41-02-05 A0 Brake
- Tender T34 BR41-02-06 A0 Body
- Tender T34 BR41-02-07 A1 Coupling and pump







