Plan L5 · Locomotives

BR 64 – supplementary plans

Leaf springs, carrying axles, cylinders and more – 1:11 – Supplementary plans for the garden railway steam locomotive class 64

9 plans · from €3.50 · Photo CD available

BR 64 – supplementary plans

A complete plan for the fully working garden railway steam locomotive of the German class 64 is available from www.dampf-modell.com. It comprises 29 sheets showing every detail fully dimensioned.

In this original set, however, the springing of the driving and carrying axles is entirely by coil springs. That is easy to build but bears no relation to the prototype. So I revised the plans: leaf springs replace the coil springs, and the bar frame includes all the changes this requires. I also completely reworked the front and rear carrying axles for greater authenticity.

You simply exchange the supplementary plans for the corresponding drawings in the existing set. Since building the cylinders is not easy, I have also revised that plan to make it easier to follow.

Cylinders and firehole door

Ordering options

  • Complete supplementary set of 9 drawings (bar frame, carrying axles, cylinders, regulator, boiler valve, firehole door, lubricator, transport box).
  • Individual drawings: Each drawing shows all the necessary views and details of the assembly. Simply state the drawing you want in your enquiry.
  • Reduced to DIN A4: the complete set on 9 sheets, e.g. to get to know it.
  • Photo CD: We photographed every interesting stage throughout the build. The captioned photos cover almost all the individual parts – 720 pictures in total.

Build report

The project began in February 2000. Originally we meant to build the BR 41 with its tender, and had obtained copies of the original drawings from the Nuremberg Transport Museum. Working them up would have taken too long, however, particularly as we did not get all the details needed for a complete build. So we obtained the BR 64 plan through the DMC publishing house. It originally came from Holland, which does not make it any harder to follow. An alternative is the Wissmann plan, but it conceals several errors, especially in the motion.

We started with the bar frame, as probably everyone does. We milled it from cold-drawn flat steel, and afterwards the side plates were as bent as a banana because of residual stresses in the material. We are building the next bar frame from hot-rolled flat steel, because this material is low in residual stress.

For long, low-maintenance running, the crank pins in the cast wheels are made of V2A stainless steel, and bronze bushes are pressed into the connecting rods as plain bearings.

The motion was complete in October 2003, and a first test run on compressed air was successful.

In the Dutchman’s plan all the axles are sprung with coil springs. This works faultlessly, as I saw on a finished BR 64, but it badly compromises authenticity and appearance.
So we promptly replaced the coil springs with home-hardened leaf springs and at the same time completely reworked the front and rear carrying axles.

For some parts we did have to build ourselves fixtures. To get the bore for the axles exactly central in the split bronze bearing, we made the following clamping fixture.

This also ensures that all six bronze bearings are identical, because the parallelism of the driving axles to each other largely decides success or failure. The centre axle should have approx. 0.1 to 0.2 mm side play and the front and rear driving axles at least 1 mm, so that the locomotive has no trouble on curves.

Do not underestimate the motion; the amount of work is enormous. Do not build it too stiff, and allow plenty of play in the connecting rods.

The steam cylinder essentially consists of a solid cast block, which we turned and milled. Grey cast iron is best, because its homogeneous structure machines very well. Choose the piston diameter so that ordinary piston rings for a 50 cc scooter will fit; they are cheap and good. In our case the piston diameter is 42 mm with a 2 mm groove.

Building the boiler – a topic of its own

It never ceases to amaze: ask 10 model railway builders how to build a decent boiler and you are guaranteed 10 different answers. Opinions diverge nowhere else as they do here. Some swear by TIG-welded boilers, others by copper boilers, and so on. I listened to plenty of views, compared them with the means at my disposal and finally decided on a welded steel boiler with copper boiler tubes expanded into it. Some of you will now be asking why he doesn’t weld steel tubes into the steel boiler. The reason is simple: once the tubes have been pushed through the boiler, they can only be welded from the outside. On the inside a fine crevice remains between tube wall and hole, which water enters, causing crevice corrosion. The boiler then slowly rusts from the inside out.
Expanding the copper tubes into the holes in the steel tube plate gives a positive joint with no crevices or gaps.
Commercial tube expanders are far too expensive and not particularly suitable for the small tube diameters in the firebox and smokebox.
For home use I designed a compact version for ø15x1.5 and ø18x1.5 copper tubes; it can also be adapted to other tube diameters.

The diameter of the cage is no larger than that of the tube being expanded. This makes it possible to expand both ends of a boiler tube from the front of the tube. This does, however, need an extension to match the length of the tubes.
You only have to work from one side if, for example, the firebox is already permanently joined to the boiler and you can only get to the tube ends from one side.
The following drawing shows the tube expander with the extension.

The cage is made of brass so that it does not damage the inside of the copper tubes.

Download as PDF
Tube expander Di=12
Tube expander Di=15

Assembly
To slide the three rollers with the cage onto the mandrel, it is best to hold the rollers in their slots with adhesive tape wrapped round the outside of the cage. The roller assembly can then be slid over the three slots in the threaded end of the mandrel. Be sure to protect this threaded end during expanding, so that the cage does not catch on it. Grease the rollers well before assembly.
The taper of the three rollers is chosen so that their outer running surfaces are parallel to each other at the end of the mandrel. As a general rule: the taper of the rollers is half that of the mandrel.
Rollers and mandrel are made of stainless steel. The mandrel has a taper of 1° and the rollers 0.5°. The exact angle is not so important, as long as the running surfaces of the rollers are parallel at the end of the mandrel.

The cage
The inner faces of the slot in the cage are tapered outwards. The angle to the centre line is 20°. The slot opening must be narrow enough that the rollers cannot fall out, yet wide enough that they can rise sufficiently in the slot.
In short: the slot opening must not be larger than the smallest diameter of the roller.

Expanding
Clamp the tube expander in the cordless drill and insert it in the end of the tube being worked on.
Make the first turns at low speed, so that the rollers form a track in the tube. While expanding, draw the drill out with only a light pull. It should work without difficulty and run freely. Oil the tool well each time before inserting it in a tube. When the rollers run quietly in the tube and make an even sound, expanding is complete.
Too much rolling can reduce the wall thickness of the tube so far that it eventually distorts and comes loose from the tube plate. Push a ball of paper into each finished tube as a marker, so that you do not roll any tube twice.

The blower has 3 nozzles arranged around the exhaust pipe. Its height is adjustable so that the best exhaust flow can be set during the trial run. Its live steam is meant to create a vacuum in the smokebox, which keeps the fire in the firebox going when the locomotive is standing and the cylinders are no longer supplying exhaust steam. A badly adjusted blower can do exactly the opposite: if it is not aligned precisely with the chimney, turbulent flow prevents the Venturi effect.

The regulator

The regulator sits in the rear steam dome. The take-offs for the whistle and the blower are there on the right-hand side, and on the right-hand side too are the take-offs for the steam feed pump and the injector. Two safety valves sit behind the dome.

The regulator supplies both cylinders with live steam. A perforated disc covers the steam inlet inside the regulator; depending on the opening angle, more or less steam flows to the cylinders. Two fine grooves milled into the back of the disc give finer control.

Fitting the regulator into the boiler is a tricky job. Once the mounting flange has been welded into the boiler, the regulator goes in from above. A threaded spigot with a tapered bore projects from the rear, and the pipe connecting to the superheater unit screws onto it. The complete superheater unit is then pushed into the boiler tubes from the front, and the connecting pipe through the front flange opening into the boiler. At the end of the connecting pipe is a cone nipple with a union nut. The difficulty is making a steam-tight joint between this union nut and the threaded spigot on the regulator. To do it, you reach the joint through the mounting flange, with the regulator already in place, using a specially adapted spanner.
Once the joint is tight enough, the regulator can be fixed in the mounting flange with two socket-head screws.

The boiler valves

The boiler feed valves are in the front steam dome. They supply the boiler with preheated feed water delivered by the axle pump and the boiler feed pump.

The boiler valves can be shut off individually and also have a non-return valve.

Lubricator

The lubricator keeps both steam cylinders supplied with enough superheated steam oil during operation. This is a special oil with a high viscosity that only falls at extremely high steam temperatures. The incoming steam would wash ordinary oil off the cylinder wall. Superheated steam oil still forms an adequate oil film on the cylinder wall under these conditions.

Rodding from the crank pin drives the lubricator. To give both cylinders the same amount of oil, two pumps can be used. Alternatively, the feed can be branched so that each cylinder has its own oil line into its steam pipe.

Burner

Most 5-inch gauge live steam drivers fire their locomotives with coal. We chose propane. This spares the locomotive ash and coal dust, and it is easier to handle. A fellow club member, speaking from experience, gave me the good tip to use the burner elements from a discarded “Autogeyser” (gas heater).

An Autogeyser consists of many individual burner elements. For our burner we took just four elements, arranged them on a new base and piped them up. I drilled out the air intakes to 7 mm, closed the gas inlet jet with silver solder and redrilled it with a ø 0.5 mm twist drill. The burner then burns better in the firebox.

Water tank and body

The water tank is made of brass sheet, reinforced by brass angles in the corners.
The whole water tank is riveted. To prevent leaks, we also soft-soldered the tanks on the inside. Pipes connect all three water tanks to one another.

The cab can be taken off for any repairs. When running, we remove the roof hatch and the rear part of the coal bunker to reach the regulator and valve gear.

Transport frame

To get the locomotive, now weighing 72 kg, from the cellar to the track, we built a transport frame. We push the locomotive into the frame from the front until its buffers sit in the frame’s buffer cups. A closing plate is then fixed to the frame from behind with two screws. The locomotive’s buffers are thus held positively in the buffer cups. To help the frame fit in the car, the carrying handles fold in at the end.

Picture: transport frame 03

Completion

After 7 years of building (from February 2000 to the first test run in steam in April 2007), the BR 64 made its maiden run on 09.04.2007 on the club track of the Hammer Modell- und Gartenbahn Freunde e.V.

Like a coal-fired locomotive, the propane-fired locomotive needs a steam-raising fan when lighting up. Without the fan on the chimney, the gas flame would go out for lack of fresh air in the firebox. After five minutes the boiler has warmed up enough to take the fan off. The blue flame shows whether the burner is getting enough fresh air. The blower can now be used too. After 20 to 25 minutes a sufficient steam pressure of 6 bar is reached and the locomotive is ready to go. The BR 64 started straight away without any trouble. With 3 wagons and 2 people on board it made its rounds on the track. The first trial run was therefore a success.

Steaming the BR 64 for the first time

On 31.03.2007, after 7 years of building (with interruptions), we lit up the BR 64 for the first time.
It passed its first test run under real conditions with flying colours.
It took approx. 15 min to reach 6 bar boiler pressure. The gas firing worked perfectly and supplied enough energy for the required quantity of steam.

These all worked perfectly:

  • Axle pump
  • Steam feed pump
  • Injector
  • Pressure relief valves

The cylinders also worked perfectly with the locomotive jacked up. We had survived the first test run. A week later the BR 64 made its first circuits on the club track of the Hammer Eisenbahnfreunde.

Conclusion

A year after first steaming, all I can say is that gas firing was the right decision. The locomotive always has enough power to pull 2 people continuously, with no enforced stops for low boiler pressure. Gas consumption is between 2 and 3 kg per hour, depending on load. Preheating the feed water also makes good use of the heat and prevents a pressure drop in the boiler. A coil around the blower heats the fresh water from the axle pump, and the preheater above the smokebox heats the water from the steam feed pump. During operation both pumps run continuously at low output, so that the water level in the boiler varies only slightly. On the first runs we used the steam feed pump only occasionally to top up the boiler. The water in the preheater grew so hot over time that steam bubbles formed. When the steam feed pump started up again, it could not force the water into the boiler against the steam bubbles and could no longer be used from then on. So the steam feed pump now stays in operation all the time as well.

Plan views

The website shows only a small part of the plan set. With the complete set you can build the model without difficulty – every part is drawn and fully dimensioned.

Contents: Supplementary plan set BR 64 (9 drawings)

  1. BR 64-03-01 A0 Bar frame
  2. BR 64-06-01 A0 Front carrying axle
  3. BR 64-07-01 A0 Rear carrying axle
  4. BR 64-09-01 A0 Cylinders
  5. BR 64-16-01 A0 Regulator
  6. BR 64-17-01 A1 Boiler valve
  7. BR 64-30-01 A2 Firehole door and control valve
  8. BR 64-31-01 A3 Lubricator
  9. BR 64-32-01 A3 Transport box
Delivery: The plans are produced as full-size paper copies (up to DIN A00) at a copy shop and sent by post. The prices shown are approximate; each order is charged individually according to current printing and postage costs.