On the full-size railway this wagon carries powdered and fine-grained materials such as cement. The prototype has a compressed-air discharge system connected to the silos by pipework. Hinged lids close the filling openings at the top of the silos.
You can order the tanks for the Kds 54 here:
Mr Michael Horst
Am Maueranger 2
83623 Dietramszell
Germany
Tel. +49 8027 908776
![]()
The tanks are laminated in glass fibre, including at the joints, which means they can also be used as water tanks, for example. Their surface is excellent and needs no further filling. You should, however, work on the parting line. Once the release wax has been removed, the tanks can be painted in any way you like.
The imitation chequer plate in plastic with a glass-fibre insert is also available as sheet material from Mr Horst. The sheet is easy to work with a saw or file and can be brought to the required outside dimensions.
Axles
The wheel (centre and rim) and the axle are stainless steel (VA), with the wheel turned from the solid. The bore for the axle is toleranced d 14 H7 and the press fit on the axle d 14 m6. Wheel and axle are pressed together cold; for a wagon axle this press fit is quite sufficient. The spring pack is the same as on the wagons already described. Making the axle boxes has always been an immense effort. But since we always fit our wagons with standard industrial ball bearings, we cannot avoid making our own housings. The housings from the well-known dealers nearly always have plain bushes and are no acceptable alternative. I had long considered having the axle box cast. From another modeller I eventually got the address of a foundry for brass castings. I had a specialist service provider make the master patterns in brass directly from my 3D CAD data. The result is perfect, but unfortunately also very expensive. The foundry can now make any number of brass castings from my master pattern at a reasonable price. On the cast housing you only need to bore the bearing seat, drill the marked holes for the cover screws and cut the M2 thread. The chucking spigot for the lathe is then parted off. The axle box cover preloads the two ball bearings so that they do not shift in service. On the cover, the working faces are turned and fitted to the housing with its bearings. Finally, the spigot that held the cover in the chuck during machining is parted off, leaving 1 mm standing.
The brake gear
What is special about this wagon is that the main brake rods do not run down the centre beneath the wagon but along the sides, operating the brake rigging at the axles through a bell crank. The reason: the two tanks later project down into the frame where the main brake rod would normally be.
This wagon has a working handbrake too. So that the brake cylinder can work independently of the released handbrake, the handbrake rod ends in a slotted hole that engages the fixed-point levers. When the brake cylinder operates, the fixed-point levers move back and forth within the slot. When you apply the handbrake, its rod first moves idly until the end of the slot is reached. Only then does the brake bite, and the brake cylinder’s piston rod is drawn out with it.
At present the brake cylinder is connected directly to the main air pipe. In this version the reservoir does not yet have a function.
Pipework for the discharge system
To empty the silos on the prototype, compressed air loosens the contents into a free-flowing mixture. For this, a porous aeration floor is fitted at the bottom of the silo, and the compressed air flows in beneath it. The pressure in the silo rises, the powdered load loosens and flows out of the silo through the riser pipe above the aeration floor. The discharge points are at the ends of the wagon. The compressed air enters at the side of the wagon through a water separator. On our model the discharge system is not operational.
Body
So that the silos would fit the body without trouble, we first mocked up the body in thick card. This way the contour of the silo wall can be cut into the card template with scissors and still be corrected. We then lay the template on the brass sheet from which the side plates are made.
After being set into the body, the silos are secured against shifting with a few screws.
Finally we fit details such as the ladder and the pressure gauge on the silo.
After painting, the lettering goes on.
The build took about 9 months.
Plan views
The website shows only a small part of the plan set. With the complete set you can build the model without difficulty – every part is drawn and fully dimensioned.
Contents: Plan set Kds 54
- GW5 01-01 A0 Assembly
- GW5 02-01 A1 Axle
- GW5 03-01 A0 Frame
- GW5 04-01 A0 Frame parts
- GW5 05-01 A0 Buffer beam
- GW5 06-01 A0 Brake
- GW5 07-01 A0 Boiler
- GW5 08-01 A0 Pipework
- GW2 05-01 A3 Brake control valve














