Prologue
Why we are building the Maid of Kent: while we were building the BR 64, an acquaintance heard about our project and asked whether we would be interested in some parts for a 5-inch gauge locomotive. Promptly we received the wooden box with brass fittings and castings such as cylinders, slide valves, wheelset and so on. As we learned, the parts had been bought in England in the early 1980s. The bar frame was then started, and after a short time everything disappeared into a wooden box until, 20 years later, it fell into our hands.
No one could find the plan for this locomotive any more, and we could not identify the type either. To find out, we sketched the bar frame and took it, together with the driving wheel, to the live steam exhibition in Sinsheim. That year we were showing our unfinished BR 64 and the covered goods wagon there. By chance an Englishman came to our stand and we had a long conversation with him. When we showed him the sketch of the bar frame and the driving wheel, he said straight away that it was the Maid of Kent and that the locomotive was doing its rounds at the show. Contact with the English owner was quickly made. I photographed the locomotive several times and was kindly sent a copy of the plans.
The construction of the Maid of Kent appeared as a series in the English magazine “The Model Engineer” between xx and yy, with detail drawings and an extensive description of the build. My plan of approx. 100 photocopied A4 pages was of course dimensioned entirely in inches. We would probably never have got the Maid of Kent running from this collection. So I began to revise the plan completely and convert it to metric. Some design improvements from our experience of building the BR 64 also found their way in.
The castings
Before starting the build, we checked the castings in the wooden box and found that not all the parts were there in sufficient numbers. What to do? At first we wanted a foundry to recast the existing castings. The result was disappointing: either the foundries did not want to bother with such small jobs, or the parts were extremely expensive. A modeller we know put us in touch with Blackgates in England. They offer several English locomotives and wagons in 5-inch gauge. We asked about the missing parts, received a quotation and placed an order. The price and quality of the grey iron castings supplied were really good.
Website: http://blackgates.co.uk/
E-mail for Blackgates: heather@blackgates.co.uk
A start has been made
Our new project, the Maid of Kent, is slowly taking shape. I had the bar frame and many small parts laser-cut in advance, as on earlier models.
The stretchers that stabilise the side plates are only screwed in for now. Only when all the parts of the bar frame are finished will everything be riveted with 2 mm rivets. Alongside the locomotive, the tender frame has also taken shape.
Axles and springing
The leaf springs are fully functional. The individual spring leaves are available by the metre. To harden the cut leaves, heat them with a gas torch until they glow cherry red, then quench them in the used oil from your last engine oil change.
The tender axle box is milled from the solid. Each axle box holds two ball bearings supporting the axle, arranged as an opposed pair.
Building the tender
The tender body is made of brass sheet. 10x10x1 mm angles stiffen the butt joints, and 2 mm brass rivets hold them together. Once the tender frame is complete, the angles and all the rivet holes are soft-soldered. We do not close the tender permanently, so that the hand pump can be serviced later. The lid over the water tank is sealed with silicone and screwed down.
The water supply from tender to locomotive runs through 4 Festo push-in connectors.
1. Injector feed, shut off by the hand crank.
2. Hand pump feed, with non-return valve.
3. Axle pump return
4. Axle pump feed
Axle pump
The axle pump draws its water from the tender and pumps it continuously into the boiler while running. When the top level in the boiler is reached, you open the bypass valve and the axle pump delivers the water back to the tender.
Blower
The blower has 3 nozzles arranged around the exhaust pipe. Its height is adjustable so that the best exhaust flow can be set during the trial run. Its live steam is meant to create a vacuum in the smokebox, which keeps the fire in the firebox going when the locomotive is standing and the cylinders are no longer supplying exhaust steam. A badly adjusted blower can do exactly the opposite: if it is not aligned precisely with the chimney, turbulent flow prevents the Venturi effect.
Brake
On the prototype the brake works with compressed air from the air pump. Our model is to operate it with steam.
Valve gear
The Maid of Kent has what is known as Joy valve gear, a form of elliptical gear.
A lever arrangement connected to the eccentric rod moves the valves.
Cylinders
There are two options for arranging the cylinders: inside and outside. With inside cylinders, the reciprocating mass of the pistons lies nearer the locomotive’s centre of gravity. Less vibration then passes to the running gear, and the locomotive runs more smoothly. On the other hand, the cramped space makes assembly and later maintenance harder. We chose outside cylinders. The oil feeds are above the slide valve chests. The cylinders receive cylinder oil separately.
The boiler
Unlike the models of the Maid of Kent built in England, our locomotive has a welded steel boiler rather than a copper one. Copper boiler tubes ø15x1.5 and ø18x1.5 are expanded into the steel boiler. We have already described the procedure in detail for the BR 64.
The blower has 3 nozzles arranged around the exhaust pipe. Its height is adjustable so that the best exhaust flow can be set during the trial run. Its live steam is meant to create a vacuum in the smokebox, which keeps the fire in the firebox going when the locomotive is standing and the cylinders are no longer supplying exhaust steam. A badly adjusted blower can do exactly the opposite: if it is not aligned precisely with the chimney, turbulent flow prevents the Venturi effect.
The regulator
The regulator supplies both cylinders with live steam. A perforated disc covers the steam inlet inside the regulator; depending on the opening angle, more or less steam flows to the cylinders. Two fine grooves milled into the back of the disc give finer control.
Fitting the regulator into the boiler is a tricky job. Once the mounting flange has been welded into the boiler, the regulator goes in from above. A threaded spigot with a tapered bore projects from the rear, and the pipe connecting to the superheater unit screws onto it. The complete superheater unit is then pushed into the boiler tubes from the front, and the connecting pipe through the front flange opening into the boiler. At the end of the connecting pipe is a cone nipple with a union nut. The difficulty is making a steam-tight joint between this union nut and the threaded spigot on the regulator. To do it, you reach the joint through the mounting flange, with the regulator already in place, using a specially adapted spanner.
Once the joint is tight enough, the regulator can be fixed in the mounting flange with two socket-head screws.
Lubricator
The lubricator keeps both steam cylinders supplied with enough superheated steam oil during operation. This is a special oil with a high viscosity that only falls at extremely high steam temperatures. The incoming steam would wash ordinary oil off the cylinder wall. Superheated steam oil still forms an adequate oil film on the cylinder wall under these conditions.
Rodding from the valve gear drives the lubricator. To give both cylinders the same amount of oil, the feed is branched: each cylinder gets its own oil line into its steam pipe.
Cladding
The boiler is wrapped in a fireproof, heat-insulating fleece and clad with suitably bent copper sheet. The cab and wheel covers are made of 1 mm brass sheet and screwed to the frame.
First lighting-up of the Maid of Kent on 02.08.2014 on the 5-inch gauge track in the Huserland.
Plan views
The website shows only a small part of the plan set. With the complete set you can build the model without difficulty – every part is drawn and fully dimensioned.
Contents: Plan set Maid of Kent
- Maid of Kent 01-01 A0 Maid
- Maid of Kent 02-01 A0 Frame
- Maid of Kent 03-01 A0 Driving axle
- Maid of Kent 04-01 A0 Cylinders
- Maid of Kent 05-01 A0 Valve gear
- Maid of Kent 06-01 A0 Axle pump
- Maid of Kent 07-01 A0 Bogie
- Maid of Kent 08-01 A0 Boiler
- Maid of Kent 09-01 A0 Regulator
- Maid of Kent 10-01 A0 Cladding
- Maid of Kent 11-01 A0 Tender
- Maid of Kent 12-01 A0 Tender
- Maid of Kent 13-01 A0 Tender


























